Aldo

Saratoga County

Village of Stillwater, NY: zoning for new construction

3 districts National Grid

The Village of Stillwater carries 3 zoning districts, each setting its own lot size, setbacks and height for what you can build. No local short-term-rental law on record - which is not the same as permission. Power here is National Grid territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (518) 664-6258 before you rely on a figure.

Looking specifically at an accessory dwelling unit? See ADU rules for Stillwater →

Zoning districts

District Min lot Setbacks F / S / R Max height ADU
V3 Neighborhood 0.23 ac 15 / 10 / 20 ft 35 ft Occupancy restricted
V4 Mixed Use 0.11 ac 0 / 5 / 5 ft 40 ft Occupancy restricted
V5 Mixed Use Center 0.11 ac 0 / 5 / 5 ft 40 ft Occupancy restricted

V3 Neighborhood - These figures are necessary but not sufficient. The regulating plan also fixes build-to lines, private frontage types, window transparency minimums, entrance and orientation rules, massing breaks every 50 ft in a linear row, and materials and colours.

  • A parcel that satisfies the lot and setback figures can still fail the code on frontage type, entrance placement or transparency, with the Route 4 corridor design guidelines layered on top.
  • A one-family dwelling and an accessory dwelling unit are both permitted by right, so a second unit comes far more easily as an accessory unit than as a duplex.
  • A two-family dwelling needs a special use permit here, a three- or four-family needs one too, and multifamily of five or more is not permitted at all.
  • Agriculture, agricultural tourism and roadside farm stands are permitted by right here, and a manufactured home or park, a cemetery or a self-storage facility is available by special use permit.

V4 Mixed Use - The figures shown are the non-waterfront case. On a waterfront parcel the side yard is 10 ft rather than 5 ft and the height drops to 2 stories or 35 ft, so establish which side of that line a parcel falls on first.

  • The front figure is a build-to band with a ceiling, not a minimum: build to the sidewalk or at most 10 ft from the frontage line, with 15 ft allowed only for outdoor dining or a plaza.
  • Pushing a building back beyond that band is a violation, not a courtesy.
  • There is no side yard setback at all for buildings sharing a party wall.
  • One-family, two-family and accessory dwelling units are permitted by right, and multifamily of five or more, mixed-use buildings, live-work units, retail and hotels go through site plan review.
  • Craft production, light industrial, drive-through windows and fast-food restaurants need a special use permit.
  • The regulating plan also fixes build-to lines, frontage types, window transparency, entrance and orientation rules, massing breaks every 50 ft in a linear row, and materials and colours.

V5 Mixed Use Center - The front figure is a build-to band with a ceiling, not a minimum: build to the sidewalk or at most 10 ft from the frontage line, with 15 ft allowed only for outdoor dining or a plaza. A fourth storey is available by bonus rather than by right.

  • The bonus is worth a whole storey: a building may reach 4 stories or 50 feet where a listed public benefit is provided and the Village Board of Trustees approves it.
  • The affordable route asks at least 10% of the units, deed restricted for not less than 30 years at 50 to 80% of HUD median household income; historic reuse and LEED design also qualify.
  • Pushing a building back beyond that band is a violation, not a courtesy.
  • There is no side yard setback at all for buildings sharing a party wall.

Short-term rentals

No local short-term-rental law on record - which is not the same as permission. The Village of Stillwater has no local short-term rental law, and that is not the same as permission. Confirm the Village's position in writing before counting on short-stay income.

Conditions the code attaches:

Good to know

Working out a budget? A standard-finish build here runs $204–$268/sq ft - see the full cost to build a house in Stillwater, or what an ADU costs here.

Sizing up a specific parcel in Stillwater?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Other Saratoga County towns

Zoning figures for Village of Stillwater are compiled from the municipal code (last reviewed 2026-08-02) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (518) 664-6258 before relying on any number. Source: the Offsite / Aldo zoning dataset.

Building outside these counties?

Aldo covers 15 New York counties today. Tell us your market and we'll build the zoning + feasibility data for it.