Saratoga County
City of Saratoga Springs, NY: zoning for new construction
Saratoga Springs runs 23 districts under a unified development ordinance, from Rural Residential at a 2-acre minimum down to Urban Residential 4, which sets density at 3,000 square feet of lot area per unit rather than a flat lot minimum, and the downtown districts are form-based with no lot minimum at all. The short-term rental rule lives outside the zoning chapter, over in Chapter 136A, and it caps both primary and non-primary residences at 150 days a year, so a rental here runs at roughly 41% of the calendar and can't be modeled on year-round occupancy; licensing ran $100 for a primary residence against $750 for a non-primary one as of 2025. A detached secondary dwelling unit is permitted by right only in UR-3 and UR-4, and an interior conversion expressly doesn't count as one. Confirm your district and the current fee schedule with the Building Department at (518) 587-3550.
Looking specifically at an accessory dwelling unit? See ADU rules for Saratoga Springs →
Zoning districts
| District | Min lot | Setbacks F / S / R | Max height | ADU |
|---|---|---|---|---|
| RR Rural Residential | 2 ac | 60 / 30 / 100 ft | 35 ft | Special permit |
| SR Suburban Residential | 0.46 ac | 30 / 15 / 30 ft | 35 ft | Special permit |
| UR-1 Urban Residential 1 | 0.29 ac | 30 / 12 / 30 ft | 40 ft | Special permit |
| UR-2 Urban Residential 2 | 0.15 ac | 10 / 8 / 25 ft | 40 ft | Special permit |
| UR-3 Urban Residential 3 | 0.15 ac | 10 / 5 / 25 ft | 40 ft | Occupancy restricted |
| UR-4 Urban Residential 4 | 0.069 ac | 10 / 5 / 25 ft | 40 ft | Occupancy restricted |
| R-MHP Manufactured Home Park | 5 ac | 50 / 50 / 50 ft | 20 ft | No |
| NCU Neighborhood Complementary Use | 0.11 ac | 5 / 5 / 25 ft | 40 ft | Special permit |
| AC Arts Corridor | 0.11 ac | 5 / 5 / 25 ft | 40 ft | Special permit |
| UN (T-4) Urban Neighborhood | — | - / 5 / 24 ft | 40 ft | Special permit |
| NC (T-5) Neighborhood Center | — | - / 0 / 0 ft | 50 ft | No |
| UC (T-6) Urban Core | — | - / 0 / 0 ft | 70 ft | No |
| OMB Office, Medical and Business | 0.23 ac | 40 / 15 / 25 ft | 40 ft | No |
| WRB Warehouse, Retail and Business | 0.46 ac | 40 / 15 / 25 ft | 40 ft | No |
| GC-U Gateway Commercial Urban | 0.23 ac | - / 15 / 25 ft | 40 ft | No |
| GC-R Gateway Commercial Rural | 0.46 ac | 40 / 20 / 25 ft | 40 ft | No |
| INST-ED Institutional Educational | 0.29 ac | 30 / 12 / 30 ft | 50 ft | No |
| INST-HTR Institutional Health, Tourism and Recreation | 0.46 ac | 30 / 12 / 30 ft | 60 ft | No |
| INST-MP Institutional Master Plan | 2 ac | 100 / 20 / 50 ft | 50 ft | No |
| INST-PR Institutional Parks and Recreation | 2 ac | 60 / 30 / 100 ft | 40 ft | No |
| IND-L Industrial Light | 0.46 ac | 40 / 15 / 25 ft | 50 ft | No |
| IND-G Industrial General | 0.92 ac | 40 / 15 / 30 ft | 50 ft | No |
| IND-X Industrial Extraction | 10 ac | 50 / 50 / 50 ft | 50 ft | No |
RR Rural Residential - For a single-family or two-family dwelling the two side yards must total 100 ft, so a house cannot simply sit 30 ft from each side line. A corner lot also has a 60 ft corner side setback, separate from the front, side and rear.
- The 25% total coverage counts buildings and paving together, which leaves little room for paving beyond the 20% building footprint.
- A townhouse or apartment building is held to the 30 ft single-side figure alone.
SR Suburban Residential - A corner lot has a 25 ft corner side setback, separate from the front, side and rear. The 40% total coverage counts buildings and paving together, against 28% for the building footprint alone.
- The 30 ft combined side yard applies to single-family and two-family dwellings only; a townhouse or apartment building is held to the 15 ft single side alone.
UR-1 Urban Residential 1 - The front setback is 30 ft or as set by the contextual front-setback rule of § 240-3.3B, and on a built-up block that section, not the 30 ft figure, sets the building line. A corner lot has a 25 ft corner side setback.
- Where the principal building is within 20 ft of the side lot lines, the first floor elevation may be at most 4 feet.
- The 30 ft combined side yard applies to single-family and two-family dwellings only; a townhouse or apartment building is held to the 12 ft single side alone.
- The 50% total coverage counts buildings and paving together; the building footprint alone is capped at 28%.
UR-2 Urban Residential 2 - For a single-family or two-family dwelling the two side yards must total 20 ft, so 8 ft on each side does not conform. A nonresidential use needs a lot of at least 10,000 sq ft.
- The front setback is 10 ft or as set by § 240-3.3B.
- A corner lot has a 10 ft corner side setback, separate from the front, side and rear.
- A townhouse or apartment building is held to the 8 ft single side alone.
- The 70% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
UR-3 Urban Residential 3 - A two-family dwelling needs at least 8,000 sq ft on 80 ft of width, so the second unit costs 1,400 sq ft of land, and a nonresidential use at least 10,000 sq ft; the lot figures shown are for a single-family or single-family-attached dwelling.
- For a single-family or two-family dwelling the side yards must total at least 12 ft, so a 5 ft side yard means at least 7 ft on the other side.
- A townhouse or apartment building is held to the 5 ft single side alone.
- The front setback is 10 ft or as set by § 240-3.3B.
- A corner lot has an 8 ft corner side setback, separate from the front, side and rear.
- The 70% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
UR-4 Urban Residential 4 - The residential lot minimum rises with the unit count at 3,000 sq ft per dwelling unit, so a four-unit building needs 12,000 sq ft. A nonresidential use takes a flat 10,000 sq ft instead.
- A duplex needs 6,000 sq ft on 80 ft at that rate, and an eight-unit building 24,000 sq ft, which on 80 ft of frontage is a lot 300 ft deep, so frontage usually binds before the rate.
- Minimum lot width is 60 ft for single-family and single-family-attached dwellings, and 80 ft for two-family, townhouse and multifamily alike.
- For a single-family or two-family dwelling the side yards must total 12 ft; a townhouse or apartment building is held to the 5 ft single side alone.
- The front setback is 10 ft or as set by § 240-3.3B.
- A corner lot has an 8 ft corner side setback, separate from the front, side and rear.
- The 75% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
R-MHP Manufactured Home Park - The 5 acre lot and 250 ft width are for the manufactured home park as a whole; an individual manufactured home site inside it needs at least 4,500 sq ft. The 20 ft height applies to the home site, not the park.
- An individual manufactured home site needs 4,500 sq ft on 45 ft of width, with 10 ft interior side, corner side and rear setbacks and a 20 ft height.
- Its front setback is 20 ft on a dedicated internal street and 10 ft on a private access drive, and a 20 ft separation is required between homes, measured wall to wall.
- The 50 ft setback also applies to the corner side of a corner lot.
NCU Neighborhood Complementary Use - Nonresidential floor area is capped at 2,000 sq ft per building. A duplex needs at least 6,600 sq ft on 60 ft of width; the lot figures shown are for a single-family or single-family-attached dwelling.
- A duplex needs 6,600 sq ft (0.1515 acres) on 60 ft, and a nonresidential use the same 5,000 sq ft on 50 ft as a single-family dwelling, where UR districts charge 10,000.
- For a single-family, single-family-attached or two-family dwelling within 20 ft of the side lot lines, the first floor elevation may be at most 4 feet.
- For a single-family or two-family dwelling the side yards must total 12 ft; a townhouse or apartment building is held to the 5 ft single side alone.
- A corner lot has an 8 ft corner side setback, separate from the front, side and rear.
- The 75% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
- The Table 4-B garage-door and roof-form design rules apply in NCU.
AC Arts Corridor - Nonresidential floor area is capped at 2,000 sq ft per building. A duplex needs at least 6,600 sq ft on 60 ft of width; the lot figures shown are for a single-family or single-family-attached dwelling.
- A duplex needs 6,600 sq ft (0.1515 acres) on 60 ft, and a nonresidential use the same 5,000 sq ft on 50 ft as a single-family dwelling, where UR districts charge 10,000.
- For a single-family, single-family-attached or two-family dwelling within 20 ft of the side lot lines, the first floor elevation may be at most 4 feet.
- For a single-family or two-family dwelling the side yards must total 12 ft; a townhouse or apartment building is held to the 5 ft single side alone.
- A corner lot has an 8 ft corner side setback, separate from the front, side and rear.
- The 75% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
- AC is exempt from the Table 4-B garage-door placement and roof-form design rules.
UN (T-4) Urban Neighborhood - The front setback is a build-to zone of 12 to 18 feet, so a building may not be set back past 18 ft, and at least 50% of the frontage must be built to it, which does not apply to single-family, single-family-attached or two-family dwellings.
- A multifamily or nonresidential building takes a 12 ft interior side setback rather than 5 ft.
- The 12 ft combined interior side setback applies to single-family and two-family dwellings only, so a townhouse or apartment building is bound by the single-side figure alone.
- On a corner lot a corner side setback applies on top of the front, interior side and rear: at least 12 ft for a residential building, and a build-to zone of 12 to 18 feet for a nonresidential one.
- A nonresidential building has a minimum height of 24 feet against the 40 ft maximum, so a single-storey shopfront is not permitted.
- The cumulative area of new and existing one-storey structures on any one lot is capped at 3,000 sq ft.
- UN sets no minimum lot area, no minimum lot width and no maximum building coverage, so the 75% impervious surface cap is the whole of the coverage answer.
NC (T-5) Neighborhood Center - The front is a build-to zone of 5 to 12 feet where the public right-of-way is 40 ft or less, or 0 to 12 feet where it is wider, alleys excluded. At least 70% of the frontage must be built to it, except for single-family, single-family-attached, two-family and townhouse dwellings.
- Height is capped at 1.1 times the width of the right-of-way or 50 ft, whichever is less, so a 40 ft right-of-way caps a building at 44 ft.
- A minimum building height of 24 feet applies, so a single-storey building is not permitted, and one-storey structures are capped at 3,000 sq ft cumulative on any one lot.
- Above the maximum base height the facade must step back at least 10 feet from the ground-floor facade line.
- A height bonus may be approved under § 240-4.4B, and a building may exceed the maximum by up to 6 ft for no more than 25% of its facade width, to a depth of 30 ft.
- An optional corner lot element of up to 25% of the building width may exceed the stepback height but not the overall height.
UC (T-6) Urban Core - A building must sit in a build-to zone 5 to 12 feet from a public right-of-way of 40 ft or less, or 0 to 12 feet from a wider one, alleys excluded, and at least 80% of that frontage must be built to it, with no exemption for any dwelling type.
- Height is capped at 1.1 times the width of the right-of-way or 70 ft, whichever is less, so a 40 ft right-of-way caps a building at 44 ft.
- A minimum building height of 24 feet applies, so a single-storey building is not permitted, and one-storey structures are capped at 1,500 sq ft cumulative on any one lot.
- Above the maximum base height the facade must step back at least 10 feet from the ground-floor facade line.
- A height bonus may be approved under § 240-4.4B, and a building may exceed the maximum by up to 8 ft for no more than 35% of its facade width, to a depth of 50 ft.
- An optional corner lot element of up to 25% of the building width may exceed the stepback height but not the overall height.
- UC sets no minimum lot area, no minimum lot width, no building coverage percentage and no impervious cap.
OMB Office, Medical and Business - On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft, not the figures shown. A corner lot has a 40 ft corner side setback.
- The 70% total coverage counts buildings and paving together; the building footprint alone is capped at 40%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
WRB Warehouse, Retail and Business - On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft, not the figures shown. A corner lot has a 40 ft corner side setback.
- The 70% total coverage counts buildings and paving together; the building footprint alone is capped at 45%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
GC-U Gateway Commercial Urban - The front is a build-to zone of 25 to 40 feet, and at least 50% of the frontage must be built to it. Buildings must be at least 24 feet tall, so a single-storey building is not permitted.
- On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft.
- A corner lot has a 25 ft corner side setback.
- The 85% total coverage counts buildings and paving together; the building footprint alone is capped at 45%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
GC-R Gateway Commercial Rural - On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft. Buildings must be at least 18 feet tall.
- The 20,000 sq ft lot minimum, the 18 ft minimum height and the 40 ft front setback are each qualified elsewhere in Article 4; read them against § 240-4.5.
- A corner lot has a 40 ft corner side setback.
- The 60% total coverage counts buildings and paving together; the building footprint alone is capped at 35%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
INST-ED Institutional Educational - A corner lot has a 30 ft corner side setback, separate from the front, side and rear. The 70% total coverage counts buildings and paving together; the building footprint alone is capped at 30%.
- The side and rear setbacks do not increase next to a residential district.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
INST-HTR Institutional Health, Tourism and Recreation - On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft, not the figures shown.
- The 80% total coverage counts buildings and paving together; the building footprint alone is capped at 45%.
- A corner lot has its own minimum corner side setback, separate from the front, side and rear.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
INST-MP Institutional Master Plan - On a lot abutting a residential district the interior side setback is 50 ft, not 20 ft. A corner lot has a 50 ft corner side setback.
- The 80% total coverage counts buildings and paving together; the building footprint alone is capped at 70%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
INST-PR Institutional Parks and Recreation - The 15% impervious cap covers buildings, paths and parking together, and it is the only coverage limit here, with no building coverage cap. On a two-acre minimum lot that means about 13,000 sq ft of hard surface for everything on the site.
- A corner lot has a 30 ft corner side setback, separate from the front, side and rear.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
IND-L Industrial Light - On a lot abutting a residential district the side setback is 40 ft and the rear setback 50 ft, not the figures shown. A corner lot has a 40 ft corner side setback.
- The 80% total coverage counts buildings and paving together; the building footprint alone is capped at 50%.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
IND-G Industrial General - Building coverage and total coverage are both 70%, so the building may occupy the whole of the permitted hard surface, leaving nothing for paving beyond it. On a lot abutting a residential district the side setback is 40 ft and the rear 50 ft.
- A corner lot has a 40 ft corner side setback.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
IND-X Industrial Extraction - An extraction or quarry use must set back 100 ft on the front, corner side and rear; the 50 ft figures shown apply to other uses. The interior side is a flat 50 ft for both.
- The 50 ft interior side setback does not rise next to a residential district.
- Where the Water Protection, Floodplain, Historic Review or Architectural Review overlay applies, it adds requirements on top of this district's standards.
Short-term rentals
Short-term rentals allowed with local rules. A City license under Chapter 136A is required before renting or even offering a short-term rental (§ 136A-4A). A home may be let for a total of 150 days in a calendar year, whether or not it is a primary residence.
Conditions the code attaches:
- The 150 days need not be consecutive (§ 136A-3).
- Fees reported for 2025 were $100 for a primary residence and $750 per license for a non-primary residence; confirm current fees with the City Clerk in the Department of Accounts.
- Each rental needs a designated property contact and must keep to the occupancy limit on its certificate of occupancy (§ 136A-6).
- Each rental needs a valid inspection and permit record from both the City Fire Department and the City Accounts Department (§ 136A-6).
- Conduct rules bind tenants and their guests, and a license can be suspended or revoked, with penalties (§§ 136A-7 through 136A-9).
- Hosts must also register with the New York State Department of Taxation and Finance, a state requirement since 1 March 2025 that does not replace the City license.
Good to know
- UtilityNational Grid territory.
- Zoning codeCity of Saratoga Springs Ch. 240, Unified Development Ordinance, adopted 3-15-2022 by L.L. No. 2-2022, current through L.L. No. 3-2026 of 5-19-2026
- Building dept(518) 587-3550
- Last reviewed2026-07-29
Working out a budget? A standard-finish build here runs $204–$268/sq ft - see the full cost to build a house in Saratoga Springs, or what an ADU costs here.
Sizing up a specific parcel in Saratoga Springs?
Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.
Other Saratoga County towns
All Saratoga County zoning: Mechanicville (City) · Ballston · Charlton · Clifton Park · Corinth · Day · Edinburg · Galway · Greenfield · Halfmoon · Malta · Milton · Moreau · Northumberland · Providence · Saratoga · Stillwater · Waterford · Wilton · Ballston Spa (Village) · Corinth (Village) · Round Lake (Village) · Schuylerville (Village) · South Glens Falls (Village) · Stillwater (Village) · Victory (Village) · Waterford (Village)
Zoning figures for City of Saratoga Springs are compiled from the municipal code (last reviewed 2026-07-29) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (518) 587-3550 before relying on any number. Source: the Offsite / Aldo zoning dataset.