Residential lots in the Town of Moreau run from a 0.11-acre minimum in UR Multifamily, One- and Two-Family Residential up to 5 acres in R-5 Agriculture, One- and Two-Family Residential, across 14 zoning districts in all. No local short-term-rental law on record - which is not the same as permission. Power here is National Grid territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (518) 792-1030 x5 before you rely on a figure.
Looking specifically at an accessory dwelling unit? See ADU rules for Moreau →
Zoning districts
| District | Min lot | Setbacks F / S / R | Max height | ADU |
|---|---|---|---|---|
| R-1 One-Family Residential | 0.52 ac | 30 / 12 / 30 ft | 38 ft | No |
| R-2 One- and Two-Family Residential | 0.52 ac | 40 / 15 / 30 ft | 38 ft | No |
| R-3 Agriculture, One- and Two-Family Residential | 1.38 ac | 40 / 20 / 30 ft | 38 ft | No |
| R-4 Agriculture, One- and Two-Family Residential | 3 ac | 40 / 20 / 30 ft | 38 ft | No |
| R-5 Agriculture, One- and Two-Family Residential | 5 ac | 40 / 20 / 30 ft | 38 ft | No |
| UR Multifamily, One- and Two-Family Residential | 0.11 ac | 30 / 12 / 30 ft | 30 ft | No |
| C-1 General Commercial | 1 ac | 50 / 15 / 30 ft | 30 ft | No |
| CC-1 Commercial and Communications | 1 ac | 50 / 15 / 30 ft | 30 ft | No |
| C-2 Neighborhood Commercial | 0.52 ac | 50 / 15 / 30 ft | 30 ft | No |
| C-3 Residential and Professional | 0.52 ac | 40 / 12 / 30 ft | 38 ft | No |
| M-1 General Manufacturing and Industrial | 1.5 ac | 30 / 25 / 30 ft | 38 ft | No |
| M-1A General Manufacturing and Industrial | 1.5 ac | 30 / 25 / 30 ft | 38 ft | No |
| M-2 General Manufacturing and Industrial | 1.84 ac | 30 / 25 / 30 ft | 38 ft | No |
| RP Resource Protection | 10 ac | 50 / 50 / 50 ft | 38 ft | No |
R-1 One-Family Residential - The lot minimum is the same with public water and sewer as without public water, and a lot must meet the minimum depth as well as the area and width.
- A place of worship needs at least 100,000 sq ft on a 300 by 300 ft lot, with up to 50 ft of height and an 80 ft front yard.
- A public or private school needs at least 5 acres on a 400 by 300 ft lot at 20% coverage, with a 1,200 sq ft minimum floor area.
R-2 One- and Two-Family Residential - Without public water the lot minimum rises to 32,500 sq ft on 175 by 175 ft; the 22,500 sq ft on 125 by 125 ft applies with public water and sewer.
- A two-family dwelling needs at least a full acre on a 175 by 175 ft lot, with at least 1,200 sq ft of floor area, and the acre applies whether or not the lot has public water.
- A senior one-family dwelling takes a lot at least 75 ft wide and 200 ft deep, with a 30 ft front yard and a 10 ft side, and must be served by municipal water.
- Each senior lot must be owned and occupied by at least one person aged 55 or over, may not be sold to anyone but a senior owner-occupier, and carries that restriction in its deed.
- Special permit uses need site plan review by the Planning Board.
- On a special permit, a club or lodge and a funeral home need at least 100,000 sq ft on a 300 by 300 lot at 10% coverage, and a golf or country club at least 50 acres.
- A telecommunication tower is confined to town-owned property in part of R-2, where it may reach 120 feet.
R-3 Agriculture, One- and Two-Family Residential - Agriculture has its own standards: at least 5 acres on 250 by 250 ft, no coverage limit, 35 ft of height and 25 ft on all three yards. Customary farm structures and a farm pond are permitted accessory uses.
- Special permit uses follow the R-1 and R-2 figures, except a day-care centre, which needs at least 60,000 sq ft on 200 by 175 ft at 25% coverage, a 1,200 sq ft floor area and 30 ft of height.
R-4 Agriculture, One- and Two-Family Residential - Most special permit uses need the same 3 acres as a house but a different lot shape, and every special use except a place of worship is held to 30 ft of height.
- A club, lodge or funeral home needs a 300 by 300 ft lot at 10% coverage, and a funeral home a 2,000 sq ft minimum floor area.
- A place of worship needs a 300 by 300 ft lot at 25% coverage and may reach 50 ft of height.
- A golf or country club needs at least 50 acres on 400 ft of width at 2% coverage; a swim club needs at least 160,000 sq ft on 400 by 300 ft at 5%.
R-5 Agriculture, One- and Two-Family Residential - Customary farm structures, a farm pond and the sale of farm produce grown on the premises are permitted accessory uses. Agriculture takes the same lot as a dwelling but 25 ft on all three yards.
- Special permit uses here follow R-4's standards, with some exceptions; confirm them with the Building Department.
UR Multifamily, One- and Two-Family Residential - Apartments, condominiums and townhouses need 5,000 sq ft of land per dwelling unit and public water and sewer, and every multifamily use needs site plan review by the Planning Board.
- One- and two-family dwellings follow R-2: a one-family takes 22,500 sq ft on 125 by 125 at 25% coverage, with an 800 sq ft floor area, 38 ft of height and a 40 ft front, 15 ft side and 30 ft rear.
- R-2's unserviced rung of 32,500 sq ft on 175 by 175 travels with that reference.
- A duplex takes the R-2 two-family row: 1 acre on 175 by 175 with a 1,200 sq ft minimum floor area, 25% coverage, 38 ft of height and the same yards.
- The 600 sq ft minimum floor area applies to each dwelling unit.
C-1 General Commercial - Every use in C-1 needs site plan review, and every commercial use takes the same lot, coverage, height and yard figures.
- No minimum floor area applies to a commercial building here.
CC-1 Commercial and Communications - A telecommunication tower needs a Planning Board special use permit and may reach 120 feet at 60% coverage on at least one acre. Site plan review is required for every use here.
- A tower must stand back from every abutting parcel and street line by 50% of its height, or 100% where the parcel abuts residentially zoned or used property (§ 149-50.1).
- The tower's lot is the land those setbacks need or the district minimum, whichever is greater.
- The uses allowed here, principal, accessory and by special permit, are the same as in C-1.
- Both the 200 ft width and the 175 ft depth bind, so a lot may meet the area and the width and still fail on depth.
C-2 Neighborhood Commercial - The 22,500 sq ft minimum is stated for a lot with public water and public sewer, and where the lot adjoins an R district a 30 ft setback applies in place of the 15 ft side yard, with fencing and/or planting.
- Ask the building department whether a lot without public water and sewer can be built on here at all.
- A single-family dwelling, a laundromat, a fueling station and an apartment over a store each need a special permit, on the same standards as the rest of the district.
- Site plan review is required for every use in C-2.
- Both the 100 ft width and the 100 ft depth bind, so a lot may meet the area and the width and still fail on depth.
C-3 Residential and Professional - Despite the C prefix this is a residential district: the permitted principal uses are a single-family dwelling, a professional office and a customary home occupation, and there are no special-permit uses.
- Public water and sewer do not change the 22,500 sq ft lot minimum.
M-1 General Manufacturing and Industrial - A 100 ft setback is required from any residential district or use, and every use needs site plan review.
- Junkyards, tow yards and salvaging, and heavy equipment sales, need at least 80,000 sq ft; light manufacturing, tool and die, instrument manufacture and vehicle service need 65,340 sq ft.
- Accessory structures over 144 sq ft must meet the principal building's setbacks, except single-family homes under § 149-5.
M-1A General Manufacturing and Industrial - A 100 ft setback is required from any residential district or use, and every use needs site plan review.
- A water-dependent use needs at least 21,730 sq ft. Warehousing, public utility power generation and park and recreation facilities need at least 80,000 sq ft.
- A single-family dwelling is a special permit use on R-2's figures: at least 22,500 sq ft with water or 32,500 without, with a 40 ft front, 15 ft side and 30 ft rear yard.
- Accessory structures over 144 sq ft must meet the principal building's setbacks, except single-family homes under § 149-5.
M-2 General Manufacturing and Industrial - A 100 ft setback is required from any residential district or use, and every use needs site plan review.
- Manufacturing, assembly or other industrial operation, agricultural packaging, processing and storage, and heavy equipment sales, rental and service each need at least 80,000 sq ft.
- Tool and die and instrument manufacture need at least 63,540 sq ft, a figure that looks like a digit transposition; confirm it with the Building Department.
- Accessory structures over 144 sq ft must meet the principal building's setbacks, except single-family homes under § 149-5.
RP Resource Protection - Hunting and fishing camps and cabins are a permitted principal use alongside the one-family dwelling, with a minimum floor area of 500 rather than 800 sq ft.
- Agriculture, timber harvesting, dog kennels, riding stables and a professional office need at least 5 acres on a 250 by 250 ft lot, with no coverage limit and 30 ft of height.
- Quarrying, mining and sand and gravel extraction are special permit uses on the same 5-acre standard.
Short-term rentals
No local short-term-rental law on record - which is not the same as permission. The Town of Moreau has no local short-term rental law, and that is not the same as permission. Confirm with the Building Department before counting on short-term rental income.
Conditions the code attaches:
- Each district's schedule is a closed list of uses, and a use absent from it has no route to approval.
- Whole-house rental of a one-family dwelling is arguably the residential use itself rather than a separate use, a question for the Town to answer.
- Saratoga County requires any room or space in a dwelling let for under 30 consecutive days to be on the county registry, and charges a 3% occupancy tax.
- County registration runs two years. An unregistered host faces fines of up to $500, and the booking platform is separately liable for processing an unregistered listing.
- New York State has required every short-term rental host to register the unit with the State through the county registry since 2025.
- Building Department: (518) 792-1030 x5.
Good to know
- UtilityNational Grid territory.
- Zoning codeTown of Moreau Zoning, Chapter 149, district Schedules of Regulations; § 149-6 as amended through L.L. No. 9-2025 of 9-26-2025
- Building dept(518) 792-1030 x5
- Last reviewed2026-07-31
Working out a budget? A standard-finish build here runs $204–$268/sq ft , and a conforming lot adds about $1,660 on top - see the full cost to build a house in Moreau, or what an ADU costs here.
Sizing up a specific parcel in Moreau?
Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.
Other Saratoga County towns
All Saratoga County zoning: Mechanicville (City) · Saratoga Springs (City) · Ballston · Charlton · Clifton Park · Corinth · Day · Edinburg · Galway · Greenfield · Halfmoon · Malta · Milton · Northumberland · Providence · Saratoga · Stillwater · Waterford · Wilton · Ballston Spa (Village) · Corinth (Village) · Round Lake (Village) · Schuylerville (Village) · South Glens Falls (Village) · Stillwater (Village) · Victory (Village) · Waterford (Village)
Zoning figures for Town of Moreau are compiled from the municipal code (last reviewed 2026-07-31) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (518) 792-1030 x5 before relying on any number. Source: the Offsite / Aldo zoning dataset.