Saratoga County
Village of Schuylerville, NY: zoning for new construction
Residential lots in the Village of Schuylerville run from a 0.069-acre minimum in R-A Residential up to 0.23 acres in R-C Residential, across 8 zoning districts in all. No local short-term-rental law on record - which is not the same as permission. Power here is National Grid territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (518) 695-3881 before you rely on a figure.
Looking specifically at an accessory dwelling unit? See ADU rules for Schuylerville →
Zoning districts
| District | Min lot | Setbacks F / S / R | Max height | ADU |
|---|---|---|---|---|
| R-A Residential | 0.069 ac | 15 / 5 / 15 ft | 30 ft | Special permit |
| R-B Residential | 0.069 ac | 15 / 5 / 15 ft | 30 ft | Special permit |
| R-C Residential | 0.23 ac | 15 / 5 / 25 ft | 30 ft | No |
| HM-S Historic Main Street | 0.046 ac | 10 / 10 / 15 ft | 40 ft | Special permit |
| C-B Commercial-Business | 0.34 ac | 15 / 0 / 15 ft | 24 ft | Special permit |
| C-H Commercial-Highway | 0.46 ac | 20 / 15 / 15 ft | 30 ft | No |
| R-R Riverfront Recreational | 0.16 ac | 25 / 10 / 20 ft | 30 ft | No |
| E-D Educational | 5 ac | — | 45 ft | No |
R-A Residential - On a vacant lot between two improved lots the front yard is the average of the two neighbours' front yards, and at least 25 ft from the right-of-way or 50 ft from road centre line, whichever is greater, so the 15 ft front yard is the exception.
- A two-family dwelling is permitted by right on the same 3,000 sq ft lot as a single-family, with identical setbacks and no additional land.
- The front setback is measured from the edge of the right-of-way, not from the property line.
- Where a nonresidential district abuts this one, for 50 ft from the boundary it must provide a front yard at least equal to this district's and match its side or rear yard along the boundary.
- A bed-and-breakfast is a special use here and is held to the same 3,000 sq ft and yards as a house.
- An accessory apartment has no figures of its own; its standards are set through the special use permit.
R-B Residential - A single-family house is the only use permitted by right, and the figures shown are the single-family ones. A two-family, multi-family, townhouse, bed-and-breakfast, public or semi-public structure or accessory apartment is a special use.
- Multi-family and townhouse rows take 6,000 sq ft on 125 ft of width with no per-unit land figure; a 6,000 sq ft lot 125 ft wide is only 48 ft deep, so frontage is what binds.
- The front setback here is measured from the edge of the tax parcel boundary, where the rest of the code measures from the right-of-way, so on a wide street the building line moves.
- On a vacant lot between two improved lots the front yard is the average of the neighbours' front yards, and at least 25 ft from the right-of-way or 50 ft from road centre line, whichever is greater.
- A bed-and-breakfast takes at least 6,000 sq ft on 100 ft of width at 25% coverage, with 15 ft front, 10 ft side and 35 ft rear yards.
- A public or semi-public structure takes at least 6,000 sq ft on 150 ft of width at 25% coverage, with 15 ft front, 25 ft side and 50 ft rear yards.
- A home occupation takes the two-family standard: at least 6,000 sq ft on 50 ft of width at 50% coverage, with a 10 ft side and 30 ft rear yard.
R-C Residential - A single-family dwelling is the only permitted residential use here and a home occupation the only special use. There is no two-family, multi-family, townhouse, bed-and-breakfast or accessory apartment in R-C.
- The 75% coverage belongs to the single-family standard; a home occupation on the same 10,000 sq ft lot is held to 25%. Confirm the 75% with the Code Enforcement Officer before relying on it.
- On a vacant lot between two improved lots the front yard is the average of the neighbours' front yards, and at least 25 ft from the right-of-way or 50 ft from road centre line, whichever is greater.
- Where a nonresidential district abuts this one, for 50 ft from the boundary it must provide a front yard at least equal to this district's and match its side or rear yard along the boundary.
HM-S Historic Main Street - A single-storey building is not permitted here. On Broad Street the standard is different again: 100% coverage and 0 ft front, side and rear, lot line to lot line, and the figures shown are the case away from Broad Street.
- Where adjacent buildings exist, or similar structures stand across a street, the minimum setback is the average setback of those structures, so the existing street wall often sets the building line.
- Confirm the parcel fronts Broad Street before relying on the 100% coverage and the zeros.
- On a vacant lot between two improved lots the front yard is the average of the neighbours' front yards, and at least 25 ft from the right-of-way or 50 ft from road centre line, whichever is greater.
- The same lot and yard standards apply to every use here, permitted and special use alike.
- Design review applies under § 4.3, the design guidelines for this district.
- The front setback is measured from the edge of the right-of-way, not from the property line.
C-B Commercial-Business - The side yard shown is the bottom of a range of 0 to 15 ft, or the prevailing setback, which is measured against the parcel's own existing buildings and, on a vacant lot, against the neighbouring parcels'.
- A multiple-family dwelling, rooming house or tourist house needs 0.5 acre plus 2,000 sq ft per dwelling unit, so 4 units need 29,780 sq ft, about 0.68 acre.
- Every row prints height as two storeys by right or 3 by special permit, 24 ft or 36 ft; a footnote requires buildings on Broad Street to be at least two storeys, so 1 storey is barred there.
- The only figure a duplex changes is the rear yard, which goes from 15 ft to 35 ft; lot area, width and coverage do not move, and both single- and two-family dwellings are special uses.
- A bed-and-breakfast, a gasoline station, a convenience store with gasoline or an automobile service garage needs at least 20,000 sq ft.
- A home occupation has no minimum lot and no coverage limit, on the district's 30 ft of width; no figures are published for a mixed use building, car wash, drive-thru or public utility structure.
- On a vacant lot between two improved lots the front yard is the average of the neighbours' front yards, and at least 25 ft from the right-of-way or 50 ft from road centre line, whichever is greater.
C-H Commercial-Highway - No dwelling use is permitted in C-H in any form. The figures shown are the 20,000 sq ft case: warehousing and storage, lumber and building supply, other commercial or industrial structures and adult uses need at least 1 acre.
- Warehousing and adult uses are also held to 35% coverage rather than 50%.
- An adult use or body modification facility carries its 20 ft front and 15 ft side and rear setbacks in addition to any setback required by § 14.3, the separation distance article.
- A hotel, motel or tourist accommodation takes 30 ft of width, 75% coverage, a 15 ft front yard, and 24 ft of height or 36 ft by special permit.
- A drive-thru establishment gets 36 ft of height where the rest of the district gets 30 ft.
- The side yard is 15 ft or the prevailing setback, measured against the parcel's own existing buildings and, on a vacant lot, against the neighbouring parcels'.
- Where a residential district abuts this one, for 50 ft from the boundary this side must provide a front yard at least equal to the residential district's and match its side or rear yard.
R-R Riverfront Recreational - A new single-family dwelling needs a special use permit here; only an existing one is by right. The 10% coverage cap allows a 700 sq ft footprint on the 7,000 sq ft minimum lot, house and accessory structures together.
- The flood protection provisions of § 8.11 apply on top of everything here; the purpose of the district is to preserve the natural function of a flood plain.
- A marina takes at least 1 acre on 200 ft of width at 25% coverage, with 50 ft front, 20 ft side and 50 ft rear yards.
- Open space recreation takes at least 2 acres on 200 ft of width at 10% coverage, and river-related recreation the same acreage and width at 25%.
- A public or semi-public use takes at least 10 acres on 200 ft of width at 10% coverage, with 50 ft front, 20 ft side and 50 ft rear yards.
- A campground is capped at 2 stories and 25 ft, with 50 ft on all three yards and 10% coverage, and its lot minimum is printed with no unit, so confirm it with the Code Enforcement Officer.
E-D Educational - The figures shown belong to a private educational facility, which is a special use. The Village imposes no dimensional standard whatsoever on a public educational facility, the use permitted by right. No dwelling use of any kind is permitted in E-D.
- Lot width and the front, side and rear setbacks are deferred to the special use permit, so the Planning Board fixes them case by case rather than the code.
Short-term rentals
No local short-term-rental law on record - which is not the same as permission. The Village of Schuylerville has no local short-term rental law, and that is not the same as permission. Confirm the Village's position with the Code Enforcement Officer in writing before counting on short-stay income.
Conditions the code attaches:
- A bed-and-breakfast is a special use in R-A, R-B, HM-S and C-B, and it must be in an owner-occupied dwelling with not more than 6 bedrooms for lodgers.
- That bed-and-breakfast is classed as B-2 transient occupancy for construction, conversion and alteration, a building-code change that drives egress, fire separation and alarm work.
- A rooming house or tourist home is a special use in C-B only, on at least half an acre plus 2,000 sq ft per dwelling unit.
- A hotel, motel or tourist accommodation is a special use in C-B on at least 1 acre at 75% coverage, and in C-H on at least 20,000 sq ft.
- New York State requires every host to register the unit through the county registry, and Saratoga County charges a 3% occupancy tax and requires registration for any let under 30 consecutive days.
- The Code Enforcement Officer at (518) 695-3881 is the office to ask.
Good to know
- UtilityNational Grid territory.
- Zoning codeVillage of Schuylerville Zoning Code, L.L. No. 1 of 2022, Art. 3 §§ 3.2 to 3.9 and § 3.14, adopted 2-9-2022
- Building dept(518) 695-3881
- Last reviewed2026-08-02
Working out a budget? A standard-finish build here runs $204–$268/sq ft - see the full cost to build a house in Schuylerville, or what an ADU costs here.
Sizing up a specific parcel in Schuylerville?
Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.
Other Saratoga County towns
All Saratoga County zoning: Mechanicville (City) · Saratoga Springs (City) · Ballston · Charlton · Clifton Park · Corinth · Day · Edinburg · Galway · Greenfield · Halfmoon · Malta · Milton · Moreau · Northumberland · Providence · Saratoga · Stillwater · Waterford · Wilton · Ballston Spa (Village) · Corinth (Village) · Round Lake (Village) · South Glens Falls (Village) · Stillwater (Village) · Victory (Village) · Waterford (Village)
Zoning figures for Village of Schuylerville are compiled from the municipal code (last reviewed 2026-08-02) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (518) 695-3881 before relying on any number. Source: the Offsite / Aldo zoning dataset.