Orange County
Town of Tuxedo, NY: zoning for new construction
Residential lots in the Town of Tuxedo run from a 0.23-acre minimum in Southfields Hamlet Residential up to 2 acres in Low Density Residential, across 15 zoning districts in all. Short-term rentals allowed with local rules. Power here is Orange & Rockland territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (845) 351-4411 before you rely on a figure.
Looking specifically at an accessory dwelling unit? See ADU rules for Tuxedo →
Zoning districts
| District | Min lot | Setbacks F / S / R | Max height | ADU |
|---|---|---|---|---|
| Special Recreation | 1 ac | 25 / 25 / 25 ft | 30 ft | No |
| Conservation | 4 ac | 100 / 75 / 100 ft | 30 ft | Occupancy restricted |
| Low Density Residential | 2 ac | 75 / 50 / 75 ft | 30 ft | Occupancy restricted |
| Low-Medium Density Residential | 1 ac | 50 / 50 / 50 ft | 30 ft | Occupancy restricted |
| Southfields Hamlet Residential | 0.23 ac | 40 / 20 / 40 ft | 30 ft | No |
| Tuxedo Town Center | 0.23 ac | 25 / 25 / 25 ft | 30 ft | No |
| Neighborhood Business | 1 ac | 50 / 50 / 50 ft | 30 ft | No |
| General Business | 1 ac | 75 / 50 / 75 ft | 30 ft | No |
| Tourism Business | 1 ac | 75 / 50 / 75 ft | 30 ft | No |
| Research Office | 1 ac | 75 / 50 / 75 ft | 30 ft | No |
| Light Industrial Office | 1 ac | 75 / 50 / 75 ft | 30 ft | No |
| Cannabis Retail Dispensary Overlay | 0.46 ac | 50 / 25 / 50 ft | 30 ft | No |
| Medium Density Residential | 0.46 ac | 50 / 50 / 50 ft | 30 ft | No |
| Medium-High Density Residential | 0.34 ac | 50 / 50 / 50 ft | 30 ft | No |
| Southfields Hamlet Business | 0.46 ac | 50 / 25 / 50 ft | 30 ft | No |
Special Recreation - No ordinary dwelling is permitted here. The only housing is a dwelling restricted to park employees, on the same lot and yards but with 20% coverage and site plan approval.
- Coverage counts driveways, parking and every other improvement, not just buildings
- A street frontage of at least 100 ft applies too, as a standard separate from lot width
- A visitor centre may cover 25%
- A reservoir and public utilities need a special use permit and are held to 15 ft and one storey
Conservation - A house here needs a special use permit rather than being a use by right, and the figures shown come with that approval. Coverage counts driveways, parking and every other improvement, not just buildings.
- Agriculture is permitted by right on at least one acre with at least a hundred and twenty-five feet of width, yards of at least twenty-five feet and at least fifty for the pair of side yards
- A standalone caretaker cottage is an accessory use and needs a lot of at least five acres
- A street frontage of at least 250 ft applies too, as a standard separate from lot width
- A golf course needs at least sixty acres, a resort lodge at least twenty-five, and commercial outdoor recreation or a commercial stable at least ten each
- A resort lodge also needs at least five hundred feet of lot width and a front yard of at least two hundred feet, and may rise forty-five feet
Low Density Residential - A single-family house is permitted by right, and no two-family house or attached dwelling is permitted. Coverage counts driveways, parking and every other improvement, not just buildings.
- A street frontage of at least 150 ft applies too, as a standard separate from lot width
- Agriculture needs at least one acre on at least a hundred and twenty-five feet of width, with yards of at least twenty-five feet
Low-Medium Density Residential - A two-family house needs a special use permit and at least an acre and a half, with coverage up to 25% on the same lot width and yards. Coverage counts driveways, parking and every other improvement, not just buildings.
- A street frontage of at least 125 ft applies too, as a standard separate from lot width
- Agriculture needs at least one acre on at least a hundred and twenty-five feet of width, with yards of at least twenty-five feet
Southfields Hamlet Residential - The district provides only for a single-family detached dwelling and public utilities, not two-family, attached or multifamily dwellings. Coverage counts driveways, parking and every other improvement, not just buildings.
- A street frontage of at least 75 ft applies too, as a standard separate from lot width
Tuxedo Town Center - The figures shown are for small shops such as an antique shop, art gallery, bank, bar or office. Coverage counts driveways, parking and every other improvement, not just buildings.
- An animal hospital needs at least a full acre on at least two hundred feet of width, with a front yard of at least seventy-five feet
- A pre-existing automotive gas station needs at least twenty thousand square feet and is held to 15 ft and one storey
- A street frontage of at least 100 ft applies too, as a standard separate from lot width
Neighborhood Business - Every use here needs site plan approval, and nearly every commercial use takes the same lot and yards shown. Coverage counts driveways, parking and every other improvement, not just buildings.
- A street frontage of at least 125 ft applies too, as a standard separate from lot width
General Business - The figures shown are for ordinary shops and offices, and lot depth varies by use between a hundred and two hundred feet. Coverage counts driveways, parking and every other improvement, not just buildings.
- Industrial agriculture needs at least five acres on at least three hundred feet of width, with at least two hundred feet of street frontage
- Industrial agriculture needs a front yard of at least a hundred feet and side yards of at least a hundred and fifty feet for the pair
- Industrial agriculture may cover 35% and rise to forty feet in two storeys
- A bank also needs at least an acre, but may rise to forty feet in two storeys
- A street frontage of at least 150 ft applies too, as a standard separate from lot width
Tourism Business - The figures shown are for ordinary shops and galleries. Outdoor commercial recreation needs at least fifteen acres on at least three hundred feet of width, with a front yard of at least a hundred feet and at least two hundred and fifty feet of street frontage.
- An animal sanctuary needs at least five acres on the same lot shape as outdoor commercial recreation
- Indoor commercial recreation needs at least two acres and is held to 10% development coverage
- Coverage counts driveways, parking and every other improvement, not just buildings
- A street frontage of at least 150 ft applies too, as a standard separate from lot width
Research Office - The figures shown are for ordinary offices, and coverage counts driveways, parking and every other improvement, not just buildings. A street frontage of at least 150 ft applies as a standard separate from lot width.
- Industrial agriculture needs at least five acres on at least three hundred feet of width, a front yard of at least a hundred feet and at least two hundred and fifty feet of street frontage
- Industrial agriculture may cover 35% and rise to forty feet in two storeys
- A building contractor establishment needs at least two acres and a front yard of at least fifty feet, with coverage up to 40%, and is held to 15 ft and a single storey
- A building contractor establishment with outdoor storage needs a special use permit
Light Industrial Office - The figures shown are for ordinary offices and light assembly, and coverage counts driveways, parking and every other improvement, not just buildings. A street frontage of at least 150 ft applies as a standard separate from lot width.
- Heavy assembly needs at least four acres and side yards of at least seventy-five feet each and a hundred for the pair, and may rise forty feet in two storeys
- Agricultural industry needs at least five acres on at least three hundred feet of width, with a front yard of at least a hundred feet
- A building contractor establishment needs at least two acres, with coverage up to 40%, and is held to 15 ft and one storey
Cannabis Retail Dispensary Overlay - This overlay carries a single use, a cannabis retail dispensary, which needs a special use permit and site plan approval. The figures shown apply to that use only; the district beneath governs every other use on the parcel.
- Coverage counts driveways, parking and every other improvement, not just buildings
- A street frontage of at least 100 ft applies too, as a standard separate from lot width
Medium Density Residential - Two-family, semi-attached and townhouse dwellings are possible here, each with a special use permit and site plan approval. A two-family house needs at least thirty thousand square feet on at least a hundred and twenty-five feet of width, with coverage up to 30%.
- A semi-attached dwelling needs at least fifteen thousand square feet on at least seventy-five feet of width, with coverage up to 35% and no more than three units to the acre
- A townhouse needs at least seven thousand five hundred square feet on at least fifty feet of width, with coverage up to 40% and no more than six units to the acre
- Where dwellings are attached, no side yard is required along the shared lot line, and their other side yards must be at least twenty-five feet
- Coverage counts driveways, parking and every other improvement, not just buildings
- A street frontage of at least 85 ft applies too, as a standard separate from lot width
Medium-High Density Residential - Two-family, semi-attached, townhouse and multifamily dwellings and a senior care facility each need a special use permit and site plan approval. A multifamily building needs at least two acres on at least two hundred feet of width and depth, at no more than six units to the acre.
- A two-family house needs at least twenty thousand square feet, at two units to the acre
- A semi-attached dwelling needs at least twelve thousand five hundred square feet at three to the acre, and a townhouse at least seven thousand five hundred at six to the acre
- A senior care facility needs at least three acres, at 60% coverage and eight units to the acre, and may rise forty-five feet and three and a half storeys
- Coverage counts driveways, parking and every other improvement, not just buildings; for multifamily it is 50% of the whole site
- Where dwellings are attached, no side yard is required along the shared lot line, and their other side yards must be at least twenty-five feet
- A street frontage of at least 80 ft applies too, as a standard separate from lot width
Southfields Hamlet Business - A dwelling is possible here only above ground-floor retail and only on a special use permit, and every use needs site plan approval. The figures shown are for small shops such as an antique shop, art gallery, bank, bar, office or craft studio.
- A grocery store, hotel, indoor commercial recreation, animal hospital or pre-existing gas station needs at least an acre on at least a hundred and fifty feet of width
- Those larger uses need side yards of at least fifty feet each and a hundred for the pair, and coverage drops to 50%
- Coverage counts driveways, parking and every other improvement, not just buildings
- A street frontage of at least 100 ft applies too, as a standard separate from lot width
Short-term rentals
Short-term rentals allowed with local rules. Tuxedo regulates short-term rentals under a local law. Confirm the current permit requirements with the Town building department before listing.
Conditions the code attaches:
- Town of Tuxedo building department: (845) 351-4411
Good to know
- UtilityOrange & Rockland territory.
- Zoning codeTown of Tuxedo Code, Chapter 98 (Zoning), Table I General Use and Bulk Requirements (Attachment 1), as of November 2025
- Building dept(845) 351-4411
- Last reviewed2026-09-15
Working out a budget? A standard-finish build here runs $211–$276/sq ft , and a conforming lot adds about $6,043 on top - see the full cost to build a house in Tuxedo, or what an ADU costs here.
Sizing up a specific parcel in Tuxedo?
Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.
Other Orange County towns
All Orange County zoning: Middletown (City) · Newburgh (City) · Port Jervis (City) · Blooming Grove · Chester · Cornwall · Crawford · Deerpark · Goshen · Greenville · Hamptonburgh · Highlands · Minisink · Monroe · Montgomery · Mount Hope · New Windsor · Newburgh · Palm Tree · Wallkill · Warwick · Wawayanda · Chester (Village) · Cornwall-on-Hudson (Village) · Florida (Village) · Goshen (Village) · Greenwood Lake (Village) · Harriman (Village) · Highland Falls (Village) · Kiryas Joel (Village) · Maybrook (Village) · Monroe (Village) · Montgomery (Village) · Otisville (Village) · South Blooming Grove (Village) · Tuxedo Park (Village) · Walden (Village) · Warwick (Village) · Washingtonville (Village) · Woodbury (Village)
Zoning figures for Town of Tuxedo are compiled from the municipal code (last reviewed 2026-09-15) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (845) 351-4411 before relying on any number. Source: the Offsite / Aldo zoning dataset.