Aldo

Orange County

Town of Tuxedo, NY: zoning for new construction

15 districts Min residential lot 0.23–2 ac Orange & Rockland

Residential lots in the Town of Tuxedo run from a 0.23-acre minimum in Southfields Hamlet Residential up to 2 acres in Low Density Residential, across 15 zoning districts in all. Short-term rentals allowed with local rules. Power here is Orange & Rockland territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (845) 351-4411 before you rely on a figure.

Looking specifically at an accessory dwelling unit? See ADU rules for Tuxedo →

Zoning districts

District Min lot Setbacks F / S / R Max height ADU
Special Recreation 1 ac 25 / 25 / 25 ft 30 ft No
Conservation 4 ac 100 / 75 / 100 ft 30 ft Occupancy restricted
Low Density Residential 2 ac 75 / 50 / 75 ft 30 ft Occupancy restricted
Low-Medium Density Residential 1 ac 50 / 50 / 50 ft 30 ft Occupancy restricted
Southfields Hamlet Residential 0.23 ac 40 / 20 / 40 ft 30 ft No
Tuxedo Town Center 0.23 ac 25 / 25 / 25 ft 30 ft No
Neighborhood Business 1 ac 50 / 50 / 50 ft 30 ft No
General Business 1 ac 75 / 50 / 75 ft 30 ft No
Tourism Business 1 ac 75 / 50 / 75 ft 30 ft No
Research Office 1 ac 75 / 50 / 75 ft 30 ft No
Light Industrial Office 1 ac 75 / 50 / 75 ft 30 ft No
Cannabis Retail Dispensary Overlay 0.46 ac 50 / 25 / 50 ft 30 ft No
Medium Density Residential 0.46 ac 50 / 50 / 50 ft 30 ft No
Medium-High Density Residential 0.34 ac 50 / 50 / 50 ft 30 ft No
Southfields Hamlet Business 0.46 ac 50 / 25 / 50 ft 30 ft No

Special Recreation - No ordinary dwelling is permitted here. The only housing is a dwelling restricted to park employees, on the same lot and yards but with 20% coverage and site plan approval.

  • Coverage counts driveways, parking and every other improvement, not just buildings
  • A street frontage of at least 100 ft applies too, as a standard separate from lot width
  • A visitor centre may cover 25%
  • A reservoir and public utilities need a special use permit and are held to 15 ft and one storey

Conservation - A house here needs a special use permit rather than being a use by right, and the figures shown come with that approval. Coverage counts driveways, parking and every other improvement, not just buildings.

  • Agriculture is permitted by right on at least one acre with at least a hundred and twenty-five feet of width, yards of at least twenty-five feet and at least fifty for the pair of side yards
  • A standalone caretaker cottage is an accessory use and needs a lot of at least five acres
  • A street frontage of at least 250 ft applies too, as a standard separate from lot width
  • A golf course needs at least sixty acres, a resort lodge at least twenty-five, and commercial outdoor recreation or a commercial stable at least ten each
  • A resort lodge also needs at least five hundred feet of lot width and a front yard of at least two hundred feet, and may rise forty-five feet

Low Density Residential - A single-family house is permitted by right, and no two-family house or attached dwelling is permitted. Coverage counts driveways, parking and every other improvement, not just buildings.

  • A street frontage of at least 150 ft applies too, as a standard separate from lot width
  • Agriculture needs at least one acre on at least a hundred and twenty-five feet of width, with yards of at least twenty-five feet

Low-Medium Density Residential - A two-family house needs a special use permit and at least an acre and a half, with coverage up to 25% on the same lot width and yards. Coverage counts driveways, parking and every other improvement, not just buildings.

  • A street frontage of at least 125 ft applies too, as a standard separate from lot width
  • Agriculture needs at least one acre on at least a hundred and twenty-five feet of width, with yards of at least twenty-five feet

Southfields Hamlet Residential - The district provides only for a single-family detached dwelling and public utilities, not two-family, attached or multifamily dwellings. Coverage counts driveways, parking and every other improvement, not just buildings.

  • A street frontage of at least 75 ft applies too, as a standard separate from lot width

Tuxedo Town Center - The figures shown are for small shops such as an antique shop, art gallery, bank, bar or office. Coverage counts driveways, parking and every other improvement, not just buildings.

  • An animal hospital needs at least a full acre on at least two hundred feet of width, with a front yard of at least seventy-five feet
  • A pre-existing automotive gas station needs at least twenty thousand square feet and is held to 15 ft and one storey
  • A street frontage of at least 100 ft applies too, as a standard separate from lot width

Neighborhood Business - Every use here needs site plan approval, and nearly every commercial use takes the same lot and yards shown. Coverage counts driveways, parking and every other improvement, not just buildings.

  • A street frontage of at least 125 ft applies too, as a standard separate from lot width

General Business - The figures shown are for ordinary shops and offices, and lot depth varies by use between a hundred and two hundred feet. Coverage counts driveways, parking and every other improvement, not just buildings.

  • Industrial agriculture needs at least five acres on at least three hundred feet of width, with at least two hundred feet of street frontage
  • Industrial agriculture needs a front yard of at least a hundred feet and side yards of at least a hundred and fifty feet for the pair
  • Industrial agriculture may cover 35% and rise to forty feet in two storeys
  • A bank also needs at least an acre, but may rise to forty feet in two storeys
  • A street frontage of at least 150 ft applies too, as a standard separate from lot width

Tourism Business - The figures shown are for ordinary shops and galleries. Outdoor commercial recreation needs at least fifteen acres on at least three hundred feet of width, with a front yard of at least a hundred feet and at least two hundred and fifty feet of street frontage.

  • An animal sanctuary needs at least five acres on the same lot shape as outdoor commercial recreation
  • Indoor commercial recreation needs at least two acres and is held to 10% development coverage
  • Coverage counts driveways, parking and every other improvement, not just buildings
  • A street frontage of at least 150 ft applies too, as a standard separate from lot width

Research Office - The figures shown are for ordinary offices, and coverage counts driveways, parking and every other improvement, not just buildings. A street frontage of at least 150 ft applies as a standard separate from lot width.

  • Industrial agriculture needs at least five acres on at least three hundred feet of width, a front yard of at least a hundred feet and at least two hundred and fifty feet of street frontage
  • Industrial agriculture may cover 35% and rise to forty feet in two storeys
  • A building contractor establishment needs at least two acres and a front yard of at least fifty feet, with coverage up to 40%, and is held to 15 ft and a single storey
  • A building contractor establishment with outdoor storage needs a special use permit

Light Industrial Office - The figures shown are for ordinary offices and light assembly, and coverage counts driveways, parking and every other improvement, not just buildings. A street frontage of at least 150 ft applies as a standard separate from lot width.

  • Heavy assembly needs at least four acres and side yards of at least seventy-five feet each and a hundred for the pair, and may rise forty feet in two storeys
  • Agricultural industry needs at least five acres on at least three hundred feet of width, with a front yard of at least a hundred feet
  • A building contractor establishment needs at least two acres, with coverage up to 40%, and is held to 15 ft and one storey

Cannabis Retail Dispensary Overlay - This overlay carries a single use, a cannabis retail dispensary, which needs a special use permit and site plan approval. The figures shown apply to that use only; the district beneath governs every other use on the parcel.

  • Coverage counts driveways, parking and every other improvement, not just buildings
  • A street frontage of at least 100 ft applies too, as a standard separate from lot width

Medium Density Residential - Two-family, semi-attached and townhouse dwellings are possible here, each with a special use permit and site plan approval. A two-family house needs at least thirty thousand square feet on at least a hundred and twenty-five feet of width, with coverage up to 30%.

  • A semi-attached dwelling needs at least fifteen thousand square feet on at least seventy-five feet of width, with coverage up to 35% and no more than three units to the acre
  • A townhouse needs at least seven thousand five hundred square feet on at least fifty feet of width, with coverage up to 40% and no more than six units to the acre
  • Where dwellings are attached, no side yard is required along the shared lot line, and their other side yards must be at least twenty-five feet
  • Coverage counts driveways, parking and every other improvement, not just buildings
  • A street frontage of at least 85 ft applies too, as a standard separate from lot width

Medium-High Density Residential - Two-family, semi-attached, townhouse and multifamily dwellings and a senior care facility each need a special use permit and site plan approval. A multifamily building needs at least two acres on at least two hundred feet of width and depth, at no more than six units to the acre.

  • A two-family house needs at least twenty thousand square feet, at two units to the acre
  • A semi-attached dwelling needs at least twelve thousand five hundred square feet at three to the acre, and a townhouse at least seven thousand five hundred at six to the acre
  • A senior care facility needs at least three acres, at 60% coverage and eight units to the acre, and may rise forty-five feet and three and a half storeys
  • Coverage counts driveways, parking and every other improvement, not just buildings; for multifamily it is 50% of the whole site
  • Where dwellings are attached, no side yard is required along the shared lot line, and their other side yards must be at least twenty-five feet
  • A street frontage of at least 80 ft applies too, as a standard separate from lot width

Southfields Hamlet Business - A dwelling is possible here only above ground-floor retail and only on a special use permit, and every use needs site plan approval. The figures shown are for small shops such as an antique shop, art gallery, bank, bar, office or craft studio.

  • A grocery store, hotel, indoor commercial recreation, animal hospital or pre-existing gas station needs at least an acre on at least a hundred and fifty feet of width
  • Those larger uses need side yards of at least fifty feet each and a hundred for the pair, and coverage drops to 50%
  • Coverage counts driveways, parking and every other improvement, not just buildings
  • A street frontage of at least 100 ft applies too, as a standard separate from lot width

Short-term rentals

Short-term rentals allowed with local rules. Tuxedo regulates short-term rentals under a local law. Confirm the current permit requirements with the Town building department before listing.

Conditions the code attaches:

Good to know

Working out a budget? A standard-finish build here runs $211–$276/sq ft , and a conforming lot adds about $6,043 on top - see the full cost to build a house in Tuxedo, or what an ADU costs here.

Sizing up a specific parcel in Tuxedo?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Other Orange County towns

Zoning figures for Town of Tuxedo are compiled from the municipal code (last reviewed 2026-09-15) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (845) 351-4411 before relying on any number. Source: the Offsite / Aldo zoning dataset.

Building outside these counties?

Aldo covers 15 New York counties today. Tell us your market and we'll build the zoning + feasibility data for it.