11 districts Min residential lot 0.34–4 ac National Grid

Residential lots in the Town of Boston run from a 0.34-acre minimum in R-3 Two-or-More Family Residential District up to 4 acres in R-2 Single-Family Residential District, across 11 zoning districts in all. No local short-term-rental law on record - which is not the same as permission. Power here is National Grid territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (716) 941-6113 before you rely on a figure.

Looking specifically at an accessory dwelling unit? See ADU rules for Boston →

Zoning districts

District Min lot Setbacks F / S / R Max height ADU
R-1 Single-Family Residential District 0.46 ac 50 / 10 / 30 ft 35 ft No
R-2 Single-Family Residential District 4 ac 50 / 10 / 30 ft 35 ft Occupancy restricted
R-3 Two-or-More Family Residential District 0.34 ac 50 / 10 / 30 ft 35 ft No
R-A Residential-Agricultural District 3 ac 50 / 10 / 30 ft 35 ft No
General Residence-Restricted Business District 0.34 ac 50 / 10 / 30 ft 35 ft Special permit
Local Retail Business District 0.34 ac 50 / 0 / 30 ft 35 ft No
General Commercial District 0.34 ac 50 / 0 / 30 ft 35 ft No
Industrial Park Research and Development District 1 ac 50 / 15 / 25 ft 30 ft No
General Industrial District 1 ac 50 / 15 / 25 ft 35 ft No
Mobile Home Court District — — — No
Planned Unit Development District 100 ac — — —

General Residence-Restricted Business District - Lot width is additive and sewer moves it: on public sanitary sewer, 75 ft for the first dwelling unit or other principal building and a further 25 ft for each unit beyond, capped at 200 ft. Without public sewer, add 25 ft to whatever that comes to.

  • The 10 ft side yard is for dwellings only: any other principal building takes 30 ft or the height of the building if greater, and 15 ft or half the height beside a lot outside a residential district
  • A dwelling for three or more families must stand fifty feet from any property line
  • The rear yard is 30 ft or the height of the principal building, whichever is greater, so the figure shown is a floor
  • Two principal buildings on one lot must stand 30 ft apart
  • The width at the front lot line must equal the width at the building line, so a flag lot is not available here

Local Retail Business District - No side yard is required for a building that is not a dwelling, but one actually provided must be at least five feet, 20 ft or the building height against a residential district boundary, and 25 ft where used for vehicular access. A dwelling takes ten feet.

  • Height splits by use: 30 ft for any dwelling and 35 ft for anything else
  • The rear yard is 30 ft or the height of the principal building, whichever is greater
  • A dwelling for three or more families needs 20,000 sq ft per structure plus a further 3,000 sq ft for each dwelling unit, and must stand at least 30 ft from every property line
  • Lot width is additive: 75 ft for the first dwelling unit or other principal building, a further 25 ft for each unit beyond, capped at 200 ft, and 25 ft more without public sanitary sewer
  • The width at the front lot line must equal the width at the building line, so a flag lot is not available here
  • A 1997 amendment marks the one- and two-family figures here as for historical purposes only, so confirm with the town before relying on them

General Commercial District - No side yard is required for a building that is not a dwelling, but one actually provided must be at least ten feet, 20 ft or the building height against a residential district boundary, 12 ft where used for vehicular access and 25 ft where used for both.

  • A dwelling takes ten feet on the side
  • The rear yard is 30 ft or the height of the principal building, whichever is greater
  • A dwelling for three or more families needs 20,000 sq ft per structure plus a further 3,000 sq ft for each dwelling unit, and must stand at least 30 ft from every property line
  • Lot width is additive: 75 ft for the first dwelling unit or other principal building, a further 25 ft for each unit beyond, capped at 200 ft, and 25 ft more without public sanitary sewer
  • A 1997 amendment marks the one- and two-family figures here as for historical purposes only, so confirm with the town before relying on them

Industrial Park Research and Development District - The 30 ft height is the by-right ceiling, and the section says so in terms: above it a special permit from the Town Board is needed, with no upper figure named for that case.

  • The 50 ft front yard rises to sixty where the lot lies opposite a residential district or where the front yard holds accessory parking
  • The 15 ft side yard rises to fifty, or the height of the principal building if greater, against a residential district boundary, and the rear yard follows the side-yard figure there
  • Retail, restaurant and commercial recreation uses are accessory only, filling no more than 15% of the principal building's gross floor area and planned as an integral part of it

General Industrial District - The 35 ft height is the by-right ceiling, and the section says so in terms: above it a special permit from the Town Board is needed, with no upper figure named for that case.

  • The 50 ft front yard rises to sixty where the lot lies opposite a residential district or where the front yard holds accessory parking
  • The 15 ft side yard rises to seventy-five, or the height of the principal building if greater, against a residential district boundary, and the rear yard follows the side-yard figure there

Mobile Home Court District - Lot size, height and yards inside a licensed mobile home court are set by the Town's Mobile Home Court Law in Ch. 70 of the Town Code rather than by the zoning chapter.

Planned Unit Development District - Density is four dwelling units per gross acre, and gross acres count developable land only: wetlands and streams come out first, so a wet parcel yields far fewer units than its deed acreage suggests.

  • At least 30% of the site must be kept as open space
  • The 100 acre threshold may be relaxed by the Planning Board where the applicant shows the objectives are met and the land is contiguous to an existing planned unit development
  • Yards, height and coverage are settled in the approved plan rather than published in advance

Short-term rentals

No local short-term-rental law on record - which is not the same as permission. The town has no local short-term rental law. That is not the same as permission, so confirm with the town before counting on renting a home short term.

Conditions the code attaches:

Good to know

Working out a budget? A standard-finish build here runs $204–$268/sq ft , and a conforming lot adds about $3,440 on top - see the full cost to build a house in Boston, or what an ADU costs here.

Sizing up a specific parcel in Boston?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Other Erie County towns

Zoning figures for Town of Boston are compiled from the municipal code (last reviewed 2026-09-10) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (716) 941-6113 before relying on any number. Source: the Offsite / Aldo zoning dataset.