Aldo

Maybrook · ADU cost

What it costs to build an ADU in Maybrook, NY

800 sq ft ≈ $205k–270k $258–337/sq ft 13 districts Central Hudson

An 800 sq ft accessory dwelling unit in Maybrook runs roughly $205k–270k, or about $258–337/sq ft, and that per-square-foot figure sits deliberately above the $211–276/sq ft a full house costs here. An ADU still needs one whole kitchen, one whole bath, its own service panel and its own heating plant no matter how small you draw it, and those costs do not shrink with the floor plan, so they land on half the square footage and push the rate up. Whether the village will let you build one is a separate question from what it costs, and it gets answered parcel by parcel rather than townwide, since the Village of Maybrook maps 13 districts that treat accessory units differently from one another, so read the table below as a starting point rather than a verdict.

Check a specific parcel for an ADU in Aldo, free →

ADU cost by size in Maybrook

Standard finish, slab on grade, on a flat and clear part of the lot, general-contractor margin included. These are structure costs at Orange County pricing, before the service and septic work a second dwelling can trigger.

SizeType$ / sq ftEstimated total
400 sq ft Studio $342–$447 $135k–180k
600 sq ft One bedroom $286–$374 $170k–225k
800 sq ft One bedroom, larger $258–$337 $205k–270k
1,000 sq ft Two bedroom $241–$315 $240k–315k

400 sq ft — One room plus a bath. Garage conversions and small backyard cottages land here.

600 sq ft — The most common detached build - a real bedroom, full kitchen, one bath.

800 sq ft — Room for a proper living area. Still a single bath and one kitchen.

1,000 sq ft — About as large as most codes allow an accessory unit to go.

Why the rate is higher than a house

The systems below are priced for an 800 sq ft unit. The middle column is what each system would cost if it simply shrank with the floor plan; the left column is what it actually costs once you account for the equipment a dwelling needs one of regardless of size. The gap between the two columns is the whole reason small builds price the way they do.

System$ / sq ft in an ADUIf it scaled with floor areaFixed per unit
Site work $8–$11 $8 —
Foundation $17–$24 $17 —
Framing $26–$33 $26 —
Envelope - roof, siding, windows $33–$42 $33 —
Plumbing $29–$35 $17 55%
Electrical $19–$24 $13 35%
HVAC $24–$29 $15 45%
Insulation $8–$9 $8 —
Interior finishes $33–$45 $28 15%
Millwork & cabinetry $19–$29 $11 55%

The fixed-per-unit share is a modeling assumption, not a figure from the code: it is our estimate of how much of each system's budget buys equipment a dwelling needs exactly one of - a kitchen rough-in, a bath group, a service panel, a heating plant - and therefore does not shrink when the unit does. Site work, foundation, framing, envelope and insulation are treated as scaling straight with floor area, which understates the premium slightly, because a small building carries more envelope per square foot of floor than a large one.

What the Maybrook code says about accessory units

Whether you can build one, and how large, is decided by the district your parcel sits in rather than by the town as a whole. The table shows how each mapped district treats ADUs alongside the lot and setback standards a second unit still has to fit inside. District boundaries and conditions vary, so treat it as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Residential Agriculture 1-Family 0.46 ac 35 / 20 / 35 ft 35 ft No
Residential 1-Family 0.18 ac 30 / 10 / 30 ft 35 ft No
Residential 1-Family 0.34 ac 30 / 10 / 30 ft 35 ft No
Residential 1-Family 0.11 ac 25 / 10 / 25 ft 35 ft No
Multifamily Residential 0.11 ac 25 / 10 / 25 ft 25 ft No
Senior Citizens Residential 5 ac 50 / 10 / - ft 35 ft No
Village Business — 0 / 12 / 20 ft 35 ft No
Highway Commercial 0.23 ac 50 / 20 / 30 ft 35 ft No
Industrial Park 0.92 ac 50 / 30 / 50 ft 35 ft No
Village Industry 0.11 ac 0 / 12 / 20 ft 35 ft No
General Industry 1.84 ac 50 / 50 / 50 ft 50 ft No
Business Shopping Center 2 ac 150 / 100 / 50 ft 35 ft No
Traditional Downtown Design 0.11 ac 0 / 0 / 20 ft 35 ft No

Residential Agriculture 1-Family - Beyond the lot width, a lot here must have 80 ft of frontage. On a corner lot, the yard on the street side must be 35 ft.

  • An accessory building may cover up to 20% of the required rear yard.
  • An accessory building in the rear yard may stand no more than 18 ft high.
  • An accessory building must sit at least 5 ft from any lot line.

Residential 1-Family - Lot frontage must be at least 80 ft, a standard separate from the 70 ft lot width shown. Side yards must add to 25 ft for the pair, so if one side is held to the 10 ft minimum, the other has to carry 15 ft.

  • On a corner lot, the side yard on the street side must be 30 ft.
  • An accessory building may cover up to 25% of the required rear yard and stand no more than 18 ft high there.
  • An accessory building must sit at least 3 ft from any lot line.
  • The 8,000 sq ft lot area is also the land required for each dwelling unit.

Residential 1-Family - On a corner lot, the side yard on the street side has to be 30 ft. Lot frontage is a separate 80 ft requirement that applies alongside the 90 ft lot width.

  • An accessory building may cover up to 25% of the required rear yard.
  • An accessory building in the rear yard may stand no more than 18 ft high.
  • An accessory building must sit 3 ft from any lot line.

Residential 1-Family - Lot frontage must be at least 80 ft, a standard separate from the 50 ft lot width shown. On a corner lot, the side yard on the street side is 25 ft.

  • An accessory building may cover up to 35% of the required rear yard.
  • An accessory building in the rear yard may stand no more than 20 ft high.
  • An accessory building must sit 3 ft from any lot line.

Multifamily Residential - Density, not lot size, binds here: 5,000 square feet of land is required for every dwelling unit. A dwelling that is not multifamily takes the R-4 standards instead, starting at 8,000 square feet of lot on 70 ft of width.

  • Under those R-4 standards, a non-multifamily dwelling needs 30 ft front and rear yards, 25 ft for both side yards together, and is held to 35 ft of height and 30% building coverage.
  • Lot frontage is a separate 80 ft standard, alongside the lot width.
  • On a corner lot, the side yard on the street side is 25 ft.
  • A single-family attached dwelling that already existed on 12 April 2004 is instead held to 2,000 square feet of lot with public sewer and water, and 2,000 square feet per dwelling unit.
  • An accessory building may cover up to 35% of the required rear yard, stand no more than 20 ft high there, and must sit 3 ft from any lot line.

Senior Citizens Residential - Lot frontage is a separate 80 ft standard alongside the 50 ft lot width, and once the five acre site minimum is met it is the 2,900 sq ft of land required per dwelling unit that sizes the building.

  • On a corner lot, the side yard on the street side must be 25 ft.
  • An accessory building may cover up to 35% of the required rear yard.
  • An accessory building in the rear yard may stand no more than 20 ft high and must sit 3 ft from any lot line.
  • The table publishes no rear yard figure for this district, so confirm that yard with the building department.

Village Business - A multifamily building here is held to the RM-1 standards instead of the business ones: 5,000 square feet of lot, 5,000 square feet per dwelling unit, 50 ft of width, 25 ft front and rear yards, 25 ft of height and 35% coverage.

  • The 12 ft side yard applies only if a side yard is provided, so a side yard is optional here and the 20 ft rear yard is the only yard that always binds.
  • The lot area, lot width, front yard and combined side yard rows are published as none required, which is what lets buildings go to the street line and to the side lot lines.
  • For a multifamily building, the two side yards together must reach 15 ft, with 10 ft on one side.
  • Outside multifamily, each dwelling unit takes 2,500 square feet of land.
  • No separate rear yard coverage or height limit applies to accessory buildings.

Highway Commercial - A senior citizen development in B-4 is held to the R-SC standards instead of the commercial ones: a five acre site and 2,900 square feet of land per dwelling unit. On a corner lot, the side yard on the street side is 50 ft.

  • For a senior citizen development, the figures are 50 ft of lot width, a 50 ft front yard, 10 ft on one side and 15 ft for both side yards, two storeys and 35% building coverage.
  • No rear yard figure is published for a senior citizen development in this district.
  • Accessory buildings are not subject to a rear yard coverage limit or a height limit here.

Village Industry - Side yards are not mandatory here: the 12 ft figure applies only if a side yard is provided, and where both exist they must total 20 ft. No front yard is required, so buildings can sit on the street line.

  • No side yard is required on a corner lot.
  • No rear yard coverage limit and no height limit apply to accessory buildings.

Business Shopping Center - On a corner lot, the side yard on the street side must be 125 ft. Accessory buildings carry their own limits here on coverage, height and distance from lot lines.

  • An accessory building may cover no more than 10% of the required rear yard.
  • An accessory building may stand no more than 15 ft high.
  • An accessory building must sit 65 ft from any lot line.

Traditional Downtown Design - A building must come to the street here: there is no minimum front yard, but the building can sit no more than 20 ft back and no less than 12 feet from the curb line. A single-storey building does not meet this district, which sets a minimum height of 20 ft in two storeys.

  • Side yards are optional, but any side yard that is provided must be at least 10 feet.
  • On a corner lot, the building must stand at least 12 ft from the curb line on the street side.
  • No lot width is required.
  • The floor area ratio of 2.0 applies in TDD and nowhere else in the village, alongside the 80% building coverage cap.
  • The rest of the district's regulations are set out in § 210-7.5.
Check my address for ADU feasibility → Free · no account needed to start

Costs an ADU adds that a house does not

Sizing up a specific parcel in Maybrook?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Building a full house instead?

A standard-finish house in Maybrook runs $211–276/sq ft, about $380k–495k at 1,800 sq ft . See what it costs to build a house in Maybrook.

ADU cost in nearby towns

ADU cost in Maybrook: common questions

How much does it cost to build an ADU in Maybrook, NY?

An 800 sq ft accessory dwelling unit in Village of Maybrook runs roughly $205k–270k at a standard finish, general-contractor margin included. A 400 sq ft studio runs about $135k–180k. Those are structure costs on an easy site and do not include the septic, water or electrical service work a second unit often triggers.

Why does an ADU cost more per square foot than a house in Maybrook?

Because a lot of a dwelling's cost is per dwelling, not per square foot. One kitchen, one bath group, one service panel and one heating plant cost about the same in an 800 sq ft cottage as in a 1,800 sq ft house, so on the smaller unit they get spread over less than half the floor area. That is why an ADU here prices at $258–337/sq ft against $211–276/sq ft for a full house, even though it is the same trades doing the same work.

Are ADUs allowed in Maybrook?

Village of Maybrook has 13 districts. All districts prohibit ADUs. Check the specific address with the free ADU checker or confirm with the building department at (845) 427-2717 before you spend money on design.

Can I rent an ADU in Maybrook short term?

No local short-term-rental law on record - which is not the same as permission for Village of Maybrook. ADU rules and short-term-rental rules are set separately, so a unit you are allowed to build is not automatically one you are allowed to rent nightly. Confirm both before you underwrite the build on short-term-rental income.

ADU costs are modeled estimates in current 2026 dollars at the Orange County regional index, general-contractor margin included, derived from Offsite's cost engine with a stated adjustment for the equipment a dwelling needs one of regardless of size. They are planning numbers for decision-support only - not a bid, quote, or guarantee, and not legal, architectural or engineering advice. They cover the structure and exclude septic expansion, utility service runs, site work beyond a flat and clear pad, and permit fees. ADU eligibility, size, owner-occupancy and permit conditions in the Village of Maybrook vary by district and often carry exceptions this page does not show; zoning last reviewed 2026-09-30; verify with the building department at (845) 427-2717 before relying on any answer. Sources: the Offsite / Aldo cost engine and zoning dataset.

Building outside these counties?

Aldo covers 15 New York counties today. Tell us your market and we'll build the zoning + feasibility data for it.