Aldo

ADU · Westchester County

Can you build an ADU in Pleasantville, NY?

Village of Pleasantville has 17 districts. 13 districts prohibit ADUs, 4 allow them with occupancy restrictions. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the Pleasantville code says

An accessory apartment is allowed by special permit on a one-family lot in RRR, RR, R and R-1, including a lot nonconforming as to bulk requirements, and the owner must live in one of the units as a principal residence (§§ 185-31A, 185-32A, 185-32B).

Conditions the code attaches:

What the Pleasantville code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
One-Family Residence 0.5 ac 40 / 20 / 40 ft 30 ft Occupancy restricted
Planned Unit Development 25 ac — — No
One-Family Residence 0.28 ac 40 / 20 / 25 ft 30 ft Occupancy restricted
One-Family Residence 0.18 ac 30 / 8 / 25 ft 30 ft Occupancy restricted
Two-Family Residence 0.11 ac 30 / 8 / 25 ft 30 ft No
Two-Family Residence 0.11 ac 30 / 8 / 25 ft 30 ft No
One-Family Residence 0.34 ac 40 / 20 / 30 ft 30 ft Occupancy restricted
Multiple Dwelling Three-Family 0.11 ac 30 / 8 / 25 ft 30 ft No
Multiple Dwelling Family Residence 0.11 ac 30 / 8 / 25 ft 30 ft No
Residence-Professional Office 0.11 ac 30 / 8 / 25 ft 30 ft No
Medium Density Residence/Office 0.23 ac 20 / 15 / 15 ft 35 ft No
Campus Office 3 ac 60 / - / - ft 40 ft No
Central Business — 0 / 0 / 0 ft 48 ft No
Central Business — 10 / 0 / 0 ft 30 ft No
Peripheral Business — 10 / 0 / 0 ft 48 ft No
Peripheral Business — 5 / 0 / 0 ft 48 ft No
Planned Light Manufacturing — 20 / 10 / 10 ft 48 ft No

One-Family Residence, One-Family Residence, One-Family Residence - The 20 ft side yard assumes a garage on the lot. A dwelling built without a garage needs at least 32 ft on one side, and 32 ft on a corner lot's side yard.

  • The Planning Commission may halve the 100 ft frontage on a cul-de-sac.

Planned Unit Development - The Planning Commission sets lot size, frontage, building location and lot coverage case by case, against standards for comparable uses elsewhere in the chapter and good planning practice (§ 185-25A(4)).

  • The 25-acre minimum must be contiguous.
  • Height is limited to 2.5 stories and 30 ft, which the Planning Commission may extend to 35 ft.

One-Family Residence - The 8 ft side yard assumes a garage on the lot. A dwelling built without a garage needs side yards totaling at least 32 ft, with one side at least 20 ft, and at least 20 ft on a corner lot's side yard.

Two-Family Residence, Two-Family Residence - A two-family dwelling needs a lot at least 75 ft wide, and each dwelling unit needs 5,000 sq ft of lot. The 50 ft width shown is for a one-family dwelling.

  • The 8 ft side yard assumes a garage on the lot; without one, the side yards must total at least 32 ft, with one side at least 20 ft.

Multiple Dwelling Three-Family, Multiple Dwelling Family Residence - The figures shown are for a one-family dwelling. A two- or three-family dwelling needs the same yards on a lot at least 75 ft wide, and a multiple dwelling needs 30 ft on each side and 30 ft at the rear, on a lot at least 75 ft wide and 100 ft deep.

  • A townhouse needs a 20 ft side yard and a 25 ft rear yard.

Residence-Professional Office - The figures shown are for a one-family dwelling. A two- or three-family dwelling needs the same yards on a lot at least 75 ft wide, and a multiple dwelling needs 30 ft on each side and 30 ft at the rear.

  • A professional office needs a 30 ft front yard and 10 ft side and rear yards, on a lot at least 50 ft wide.

Medium Density Residence/Office - The figures shown are for a multiple dwelling, measured as minimum distances from the street and from the property line. One-, two- and three-family dwellings and offices in residences follow the R-2 district's bulk rules instead.

  • An office needs the same 20 ft and 15 ft distances, on a 50 ft lot.
  • A townhouse must be at least 30 ft from the street.

Campus Office - Buildings must be at least 150 ft from any RRR through R-4 district, and principal buildings at least 30 ft apart.

Central Business - A side or rear yard next to a residence district must be at least 20 ft. No yard is otherwise required, but a side or rear yard that is provided must be at least 6 ft.

  • The lot must be at least 2,500 sq ft, with no minimum width or depth.

Central Business - A side or rear yard next to a residence district must be at least 20 ft. Side and rear yards are otherwise not required, but one that is provided must be at least 6 ft.

  • The lot must be at least 2,500 sq ft, with no minimum width or depth.

Peripheral Business, Peripheral Business - A side or rear yard next to a residence district must be at least 10 ft. Side and rear yards are otherwise not required, but one that is provided must be at least 5 ft.

  • The lot must be at least 5,000 sq ft, with no minimum width or depth.

Planned Light Manufacturing - A side or rear yard next to a residence district must be at least 20 ft, and the lot must be at least 5,000 sq ft, with no minimum width or depth.

ADUs vs. short-term rentals in Pleasantville

No local short-term-rental law on record - which is not the same as permission for Village of Pleasantville. The Village of Pleasantville has no local short-term rental law, and that is not the same as permission. Confirm with the building department before counting on the use. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — Pleasantville, NY

Are ADUs allowed in Pleasantville, NY?

Village of Pleasantville has 17 districts. 13 districts prohibit ADUs, 4 allow them with occupancy restrictions. Check your address with the free ADU checker, or confirm with the building department at (914) 769-1926.

Do I need a special permit for an ADU in Pleasantville?

No district in Village of Pleasantville requires a special-use permit for an ADU - 13 districts prohibit ADUs, 4 allow them with occupancy restrictions. Site-plan review or a building permit may still apply.

Can I use an ADU as a short-term rental in Pleasantville?

No local short-term-rental law on record - which is not the same as permission for Village of Pleasantville. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in Pleasantville

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $235k–310k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in Pleasantville, priced by size.

How we know this

Zoning code
ecode360.com/PL1550
Districts confirmed
17 of 17 — every mapped district.
Last reviewed
Not covered here
Overlay districts, the zoning map, and any conditions attached to an individual parcel. Size limits and owner-occupancy terms sit in the code section above, not in this summary.

ADU information for Village of Pleasantville is compiled from the municipal code (last reviewed 2026-06-08) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (914) 769-1926 before relying on any answer. Source: the Offsite / Aldo zoning dataset.

Building outside these counties?

Aldo covers 15 New York counties today. Tell us your market and we'll build the zoning + feasibility data for it.