Can you build an ADU in Honeoye Falls, NY?

Village of Honeoye Falls has 4 districts. 3 districts allow ADUs with a special-use permit, 1 does not. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the Honeoye Falls code says

An accessory unit of up to two bedrooms needs a special permit in R-1, R-2 and R-4, and the owner must live on the lot. R-3 has none; there a house of at least 2,000 sq ft can be converted to three or more full dwellings by right.

Conditions the code attaches:

What the Honeoye Falls code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Single-Family Residential 0.23 ac 15 / 10 / 20 ft 35 ft Special permit
Transitional Residential 0.23 ac 15 / 10 / 20 ft 35 ft Special permit
Multifamily Residential 0.23 ac 20 / 12 / 20 ft 35 ft No
Village Residential — - / 12 / 20 ft — Special permit

Single-Family Residential - R-1 is single-family only: a two-family dwelling and multifamily housing in any form are prohibited.

  • Without public sewers the lot minimum is 24,000 sq ft, whatever the use; the village is on public sewer, so the figure shown is the right default for a serviced parcel.
  • A nonresidential use takes 12,000 sq ft on 65 ft of width, with a flat 15 ft side yard and no two-yard total, and a 30% coverage cap rather than 35%.
  • As an alternative to the stated figure, the front yard may match the most common front yard on the block, within two feet either way.
  • Both side-yard figures bind: 10 ft on one side and 25 ft for both together, so at least one side has to be wider than 10 ft.
  • Accessory structures need 3 ft side and rear yards, are capped at 24 ft and may not be taller than the principal structure.
  • A nonresidential use needs a 25 ft rear yard, rising to 50 ft where it is next to a residential use.

Transitional Residential - A two-family dwelling is allowed here by right, and a multifamily dwelling by conversion on a special permit.

  • Without public sewers the lot minimum is 24,000 sq ft, whatever the use.
  • A two-family dwelling takes 12,000 sq ft rather than the 10,000 a single-family needs, so the second unit costs 2,000 sq ft of land and no discretionary approval.
  • Multifamily is by conversion only, on a special permit, stated per dwelling unit at 4,000 sq ft each on 65 ft of width; a nonresidential use takes a 30% coverage cap.
  • The front yard may instead match the most common front yard on the block, within two feet either way, and both side figures bind: 10 ft on one side with 25 ft for both.
  • Accessory structures need 3 ft side and rear yards, are capped at 24 ft and may not be taller than the principal structure.
  • A nonresidential use needs a 25 ft rear yard, rising to 50 ft where it is next to a residential use.

Multifamily Residential - All development in R-3 must provide for clustering and open space (§ 190-18), so a conventional subdivision is not available. A minimum open space of 35% applies alongside the 35% building coverage cap, and the two are independent.

  • Without public sewers the lot minimum is 30,000 sq ft, whatever the use.
  • A two-family dwelling is permitted by right and takes 12,000 sq ft rather than 10,000; a nonresidential use takes 12,000 sq ft on 80 ft of width with a 15 ft side yard.
  • Multifamily is permitted by right in both new construction and conversion, stated per dwelling unit at 5,000 sq ft each on 80 ft of width, so an acre supports about 8 units.
  • The front yard is a range of 20 ft minimum and 40 ft maximum, or it may match the most common front yard on the block within two feet either way.
  • Both side-yard figures bind: 12 ft on one side and 30 ft for both together, so at least one side has to be wider than 12 ft.
  • The Zoning Board of Appeals may vary the dimensional and open space requirements below five acres, and driveways, parking, roads, ponds and platted lots do not count as open space.

Village Residential - Lot size, lot width, front yard and building height have no fixed figures here: each is approved in subdivision and site plan review, and a variety of lot sizes is required, so a plan of uniform lots does not comply.

  • A nonresidential use takes 80 ft of width with a 15 ft side yard and a 25 ft rear yard.
  • All development must provide for clustering and open space (§ 190-18), so a conventional subdivision is not available, and a minimum open space of 45% applies alongside the 35% coverage cap.
  • The Zoning Board of Appeals may vary the dimensional and open space requirements where a subdivision is under five acres (§ 190-19).
  • Without public sewers the minimum lot is 30,000 sq ft, whatever the use.
  • Multifamily new construction needs a special permit and multifamily by conversion is prohibited. A manufactured home park needs a special permit and 5 acres.
  • Accessory structures need 3 ft side and rear yards, are capped at 24 ft and may not be taller than the principal structure.

ADUs vs. short-term rentals in Honeoye Falls

No local short-term-rental law on record - which is not the same as permission for Village of Honeoye Falls. The Village of Honeoye Falls has no local short-term rental law, and that is not permission: its residential use table (§ 190-15) is a closed list with no short-term rental use in it. Confirm with Code Enforcement before counting on the use. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — Honeoye Falls, NY

Are ADUs allowed in Honeoye Falls, NY?

Village of Honeoye Falls has 4 districts. 3 districts allow ADUs with a special-use permit, 1 does not. Check your address with the free ADU checker, or confirm with the building department at (585) 624-6150.

Do I need a special permit for an ADU in Honeoye Falls?

It depends on the district: 3 of 4 require a special-use permit, the rest do not. Check the district that applies to your parcel before you design.

Can I use an ADU as a short-term rental in Honeoye Falls?

No local short-term-rental law on record - which is not the same as permission for Village of Honeoye Falls. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in Honeoye Falls

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $200k–260k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in Honeoye Falls, priced by size.

How we know this

Sections analyzed
Ch. 190 § 190-15 Residential District Use Lists; Art. IX § 190-55 Accessory dwelling units; § 190-64A Multifamily dwellings, by conversion
Districts confirmed
4 of 4 — every mapped district.
Last reviewed
Not covered here
Overlay districts, the zoning map, and any conditions attached to an individual parcel. Size limits and owner-occupancy terms sit in the code section above, not in this summary.

ADU information for Village of Honeoye Falls is compiled from the municipal code (last reviewed 2026-08-13) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (585) 624-6150 before relying on any answer. Source: the Offsite / Aldo zoning dataset.

Building outside these counties?

Aldo covers 15 New York counties today. Tell us your market and we'll build the zoning + feasibility data for it.